Customization: | Available |
---|---|
Material: | Carbon Steel |
T/S: | 1770MPa |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Standard | AISI, ASTM, DIN, GB, JIS, SUS |
Lay | R.H.R.L/L.H.R.L. |
Diameter | 6mm-36mm |
Length | as customers' request |
Surface | E.G./H.G. |
Material | Carbon steel |
When ordering our exceptional steel wire ropes, please furnish the following detailed information to guarantee precision and complete satisfaction:
a. Purpose: Indicate the intended use or specific environment where the rope will be utilized, ensuring the ideal selection.
b. Size: Clearly specify the rope's diameter in either millimeters or inches to ensure a perfect fit for your needs.
c. Construction: Provide the number of strands, wires per strand, and the specific type of strand construction for optimal performance.
d. Type of Core: Select from Fiber Core (FC), Independent Wire Rope Core (IWRC), or Independent Wire Strand Core (IWSC) for maximum structural integrity.
e. Lay: Indicate the desired lay style: Right regular lay, left regular lay, right lang lay, or left lang lay for a customized twist direction.
f. Coating: Choose the preferred finish: bright (ungalvanized), galvanized, stainless, PVC, or grease to suit your protection needs.
g. Grade of Wire: Specify the tensile strength of the wires to meet your operational requirements precisely.
h. Breaking Load: Indicate the minimum or calculated breaking load in tons or pounds for optimal safety standards.
i. Lubrication: Confirm if lubrication is needed and specify the preferred type of lubricant for increased durability.
j. Length: Determine the total length of the wire rope necessary for your project requirements.
k. Packing: Choose the packing method: coils wrapped with oil paper and hessian cloth, or sturdy wooden reels for secure transport.
l. Quantity: Specify by the number of coils or reels, or detail by length or weight for accurate and efficient fulfillment.
m. Remarks: Include any shipping marks and special requirements to meet your unique needs precisely.
Terms:
1) Loading port: Nantong, China offers strategic access for seamless logistics and global reach.
2) Delivery term: Opt for FOB, CFR, or CIF, providing flexible shipping options tailored to your specific needs.
3) Delivery lead time: Experience prompt delivery within 20 working days post deposit confirmation, ensuring timely project execution.
4) Payment term: Secure your order with a 30% T/T deposit while offering balance settlement via T/T for enhanced financial flexibility.
5) Quality assurance: Enjoy peace of mind with our Mill Test Certificate accompanying your shipment, along with the option for third-party inspection for added quality assurance.
A: yes, we have. But Brazil need Inmtro certificate, after customer get this certificate, then we can export.